The Felicity residential complex on Karl Miklosh Street, 33, in the Sykhiv district of Lviv is growing at a rapid pace. The architecture of the complex stands out with dynamic shapes and clear facade graphics, and construction work is progressing according to plan.
Section 1.3 / 1.4
The brickwork of the 2nd and 3rd residential floors has been completed, and work has begun on levels 4-7. The installation of reinforced concrete parapets for the terraces on the 2nd floor and the roof has started, which will complete the future silhouette of the building.
Section 1.2
The construction of the vertical structures of the basement level has been completed, which will serve as the foundation for the underground parking, technical rooms, and engineering utilities. At the same time, the formwork installation for the concreting of the first level slab is ongoing, after which the vertical structures of the first floor will be erected.
Section 1.1
The installation of vertical structures, which will form the building’s frame, has begun. Preparatory work is underway for the reinforcement and concreting of the ramp for the underground parking entrance.
Construction work is proceeding according to schedule, and the Felicity residential complex is confidently moving toward the next stage of implementation.